IDES timeline Redstone Arsenal

Shakeyhands

PEB Forum Regular Member
Its been a long journey but it is almost over, signed my 199 today 60% Army, 90% VA. Thank God its almost over. The IDES System works, but it is a little slow at some points. My best advice is to just hang in there. Hope this post helps someone get a general idea of what to expect.

MEB initiated 15 Mar 2011
MEB entered into system 1 Aug 2011
MEB Physical 9 Aug 2011
MEB Physc eval 22 Aug 2011
QTC Physical 7 Sep 2011
QTC Physc eval 21 Sep 2011
Narsum completed and signed 14 Nov 2011
Unfit from IPEB at Sam Houston 29 Nov 2011
Signed 199 4 Jan 2012
 
I was rated 20% for Lumbar Degenerative Disc Disease and 50% for Depressive Disorder combined it came to 60% for Army. As far as the VA goes I got another 50% for Sleep Apnea with CPAP and I had a number of other conditions that were rated at 10% each.
 
Please let me know when you get your orders i'm on the same timeline as you i received my 199 today
 
I was rated 20% for Lumbar Degenerative Disc Disease and 50% for Depressive Disorder combined it came to 60% for Army. As far as the VA goes I got another 50% for Sleep Apnea with CPAP and I had a number of other conditions that were rated at 10% each.
What was your ROM for Flexion on your back?
 
Top